Hyperscale data centers are massive facilities that consume far more electricity than earlier generations of data centers. Their size and energy demands are driven by the rapid expansion of Artificial Intelligence. Hyperscale facilities are typically defined as having a minimum capacity of 40 MW or 50 MW. They require a staggering amount of electricity to run thousands of servers, storage devices, and networking equipment around the clock, seven days a week.
Ohio is seeing a surge in large hyperscale data centers. For example, Cologix began construction on an AI data center with 120 MW of capacity, and the U.S. Department of Energy recently announced plans for a 10 GW data center in Pike County. The Cologix facility will use enough electricity to power more than 70,000 Ohio households.[1] The Pike County project will require more electricity than is used by every residential ratepayer in Ohio combined.[2]
According to the Data Center Proposal Tracker, a citizen-led platform that crowdsources data on U.S. data centers, proposed data centers in Ohio have a cumulative demand of 17.6 GW, while the FracTracker Alliance’s U.S. Data Centers Tracker, a separate source, estimates 6,135 MW in load growth driven by proposed data centers in Ohio, with 12.0 GW under construction.
According to PJM’s 2026 load forecast report, summer peak load in the transmission zones served by AEP and AES[3] is expected to increase by 5.3% and 5.2% per year, respectively, over the next decade,[4] — the 3rd- and 4th-highest load growth rates among the 22 transmission zones in PJM’s territory.[5] And this growth is rapidly accelerating: Just five years earlier, AEP and AES projected an annual growth rate of 0.4% between 2022 and 2031.[6]
Soaring electricity demand means higher utility bills, more blackouts, and more pollution, plus all the illness and reduced quality-of-life that comes with it. In Ohio, where a large share of existing and planned data centers are concentrated,[7] we’ll face more than our share of those consequences.
To learn more about data centers, visit our data center resource page.
[1] Based on average sales (kWh) per residential customer in Ohio, using data from Electric Power Monthly, Electricity sales to ultimate customer by state and sector (retail sales of electricity and number of customer accounts, January-December, 2025), Energy Information Administration. Total demand for a 100 MW data center assumes an 85% load factor and 24/7 operations.
[2] Electric Power Monthly, Electricity sales to ultimate customer by state and sector (retail sales of electricity, January-December, 2025), Energy Information Administration, 2025.
[3] The AES transmission zone covers Dayton and parts of Western Ohio. AEP’s transmission zone spans Central and Southeast Ohio, along with parts of Northwest Ohio and several other states. See the map of PJM zones for details.
[4] PJM Forecasts & Reports, 2026 Long-Term Load Forecast. Table B-1: Summer Peak Load (MW) and Growth Rates for Each PJM Zone and Geographic Region (2026-2046). PJM Interconnection.
[5] PJM Interconnection is the regional transmission operator that serves Ohio, along with all or parts of 12 other states and Washington, D.C.
[6] PJM Forecasts & Reports, 2021 Load Report (Previous Reports). Table B-1: Summer Peak Load (MW) and Growth Rates for Each PJM Western and PJM Southern Zone, Geographic Region and RTO (2021-2031). PJM Interconnection.
[7] According to the Pew Research Center, Ohio is home to the 6th-highest share of planned and existing data centers in the U.S., including both hyperscalers and smaller, colocation facilities.